The region marked in red is waste of Good Money Tanzania should abandon its regional SGR ambitions for now. She should instead focus on and develop a domestic SGR. The regional SGR is spending good money chasing after bad money. This is why; Uganda has chosen to build her Standard Gauge Railway link through the Northern corridor to the Mombasa Port. Uganda’s departure puts the viability of the Central Corridor and the Dar-es-salaam Port as a regional transport hub, in doubt. The feasibility study on the Dar-Es-salaam, Isaka, Kigali, Keza- Musongati ( DIKKM) Railway Project, as the Central Corridor line is called, shows that the traffic flow on the line is low and that, to make a minimum return on investment, it must ship 8.5 million tons per year. Tanzania on her own can generate an estimated 3.1 million tons of freight per year; Rwanda, including DRC 2.3 million tons and Burundi 3.1 million tons. These numbers are estimated at what is called the conservative l...
Comments
Post a Comment